Contact Us   
Search   
Your Position: Home > News > Company News

Plastic runway reasonable maintenance conditions

2013/7/16      view:

Plastic runway is one of the architectural decoration are frequently applied to a product, this product can better show the practicability of their products, can bring more and better help to our lives, so we should be how to maintain this product, read the below and you will understand:

Plastic runway, attractive and durable, if can often maintenance, will greatly extend its service life. Use daily maintenance should be paid attention to the following:

1, plastic runway under the condition of drainage facilities have a certain, to adapt to the all-weather use. Plastic runway as athletes training and competition and the students of sports and fitness exercise, not for other purposes;

2, plastic track laying is completed, need maintenance after 7 to 10 days before using.

3, to avoid long-term load;

4, to avoid material pollution, often keep clean, avoid severe mechanical shock and friction, traffic is not allowed on the runway, heap pressure heavy and sharp objects, etc. (except standard running shoes). Players must wear special shoes, nail length is generally not more than 7 mm, jumping shoes is generally not more than 11 mm. If the shoes with long nails, are not allowed to use on the plastic runway.

5, avoid fireworks and isolate heat source, avoid contact with organic solvents, chemicals, cigarette butts and other fire, pollution, etc.

6, plastic runway edge protection, shall not be any tilt, if discover kerb damage, foaming phenomenon should promptly notify the construction units for repair.

7, should often water spray cleaning, cleaning after the glue dry cloth to remove surface is more than a small amount of water available. Oil can be used on 10% ammonia water or detergent, detergent scrub clean.